news pappernews papper

中新社北京3月20日电(记者 陈溯)记者20日从中国水利部获悉,当天,南水北调东线北延工程、岳城水库、潘庄引黄、引滦工程、官厅水库、再生水及雨洪水六个水源的水全部进入京杭大运河,京杭大运河黄河以北707公里河段有水有流,京杭大运河连续三年实现全线水流贯通。

标题:The Grand Canal in China Achieves Three Consecutive Years of Full-length Water Flow

Keywords: Grand Canal, Water Navigation, Water Conservancy Projects

News content:
BEIJING, March 20 (Xinhua) — The Grand Canal in northern China has achieved full-length water flow for the third consecutive year, with water from six sources — the Northward Extension Project of the Eastern Route of the South-to-North Water Diversion Project, the Yucheng Reservoir, the Panzhuang Yellow River Diversion Project, the Yongding River Diversion Project, the Guanting Reservoir, and recycled water and storm runoff — entering the canal on March 20, according to the Ministry of Water Resources. The 707-kilometer stretch of the Grand Canal north of the Yellow River is now flowing with water.

翻译内容:
– Title: The Grand Canal in China Achieves Three Consecutive Years of Full-length Water Flow
– Keywords: Grand Canal, Water Navigation, Water Conservancy Projects
– News content: The Grand Canal in northern China has achieved full-length water flow for the third consecutive year, with water from six sources entering the canal on March 20, according to the Ministry of Water Resources. The 707-kilometer stretch of the Grand Canal north of the Yellow River is now flowing with water.

【来源】http://www.chinanews.com/sh/2024/03-20/10183928.shtml

Views: 1

发表回复

您的邮箱地址不会被公开。 必填项已用 * 标注